Sewage treatment plant Hohenwestedt
Project description
Expansion of sewage plant Hohenwestedt from 8.800 inhabitants up to 12.000 inhabitants. Remodeling of an existing sludge container to a SBR-plant (3-line). Equipped with fine-bubble membrane aeration, agitator excess sludge removal and clear water take-off-unit. Expansion of the existing compressor station. Extension and adaptation of the control system on a future 3-line SBR-plant.
Construction of a mechanical sludge dewatering with flocculent metering station, thin sludge pumping station and switchboard in a new building for drainage as well as construction of a roofed sludge warehouse with an area of approx. 500 m2.
Our services:
Phase 1-9 according to HOAI of all trades, such as construction engineering and instrumentation and control technology, including construction management and site supervision.