ISO Zertifizierung
ISO Zertifizierung

Sewage Treatment Plant Schmalfeld

Project description

Remodeling of pond sewage plant in Schmalfeld.

Into the pond sewage plant with a connection size of about 4,500 inhabitants also drains the municipal wastewater as well as the wastewater of a dairy farm based in Schmalfeld.

The existing peripherals, especially the activation, were replaced by a floating fine-air-bubble aeration. Additionally a compressor station including an equipment house was built.

The lead-in-area was created from scratch and a screen-rake building was set up, where the new screen rake system will preclean the sewage mechanically at the flume in future.

Our services:

Phase 1-8 according to HOAI of all trades, such as construction engineering and instrumentation and control technology, including construction management and site supervision.